HCONN UNIFIED PLANT OPERATIONS
How inspections run in ePS

Every Process Safety Inspection, Planned and Proven

From the inspection form to a repaired defect, with a complete record for audits.

  1. Set up equipment and forms

    Each process safety system, equipment type and inspection type gets an inspection form with its tasks, instructions, frequency, required inspector skill and supporting documents. Vendor inspections are supported too.

  2. Plan each inspection

    Every piece of equipment carries its inspection frequency, next due date, the equipment state needed during the inspection, the inspection resource and the assigned inspector.

  3. Assign qualified inspectors

    Inspections are assigned by required skill, and the system shows which inspectors hold it. Class 1 chemical systems are flagged.

  4. Perform the inspection

    Inspectors answer each task, add comments, photos, videos and documents, see the equipment's open defects, log new defects as they find them, and record the result: no defects or defects found.

  5. Repair and report

    Defects that need repair are tracked with the work order number until resolved, and can be reopened. Reports show scheduled, overdue, completed and forecasted inspections.

What's in the system

Built for Process Safety Programs

Inspection forms that set the standard

Templates hold the tasks, instructions, attachments, frequency and inspector skill for each inspection type, and can be printed when a paper copy is needed.

Equipment records with documents

Each piece of equipment keeps its P&ID number and title, safety tag number, hazard, protective action, size or setpoint, inspections, next due dates, instructions and linked documents in one record.

Inspector training and qualifications

Track required inspector training, process safety, thermal and combustion and relief valve schools, drawing and database training, continuity, inspections in the past 12 months and the date of the last inspection.

Certificates with expiration dates

Record each inspector's certificates with issuer, issue date and expiration date.

Assignment by skill

Assign inspections to inspectors with the required skill, and search open inspections by system, department, location and due date.

Defects to repair

Log defects during an inspection or on their own, with attachments. Mark what needs repair, record the work order number, and note who resolved it and how.

Reports for audits

Review of performed inspections with the full inspection form; performed, scheduled, open, overdue and completed inspections; summaries by department, entity and inspection type; defect summary and detail; equipment inventory; inspection comments; forecasts by system and department; Excel export.

Records that support PSM

Complete digital inspection records that support your OSHA Process Safety Management program and audit readiness.

Company sign-in

Users sign in with their company account, and admin tools manage users, qualifications, equipment and forms.

In Use Across Plants

ePS is in use at multiple U.S. plants of a Fortune 50 manufacturer, including a new plant that asked for eSIRMCA and ePS together from day one in 2018.

Where ePS Process Safety fits

Most Plants Start with eSIRMCA, Then Add ePS Process Safety

Plants usually begin with eSIRMCA. When they're ready, they add ePS Process Safety and the other systems below, one at a time, when the fit is right.

Ready to Tighten Process Safety?

Add ePS to a plant that runs eSIRMCA, or start with both together.

Request an ePS Demo